artist rending of a building at the Granite Telephone City Logistics Centre

Granite Telephone City Logistics Centre is a world-class, 1.7M SF business park strategically positioned in the dynamic and growing market of Brantford, just one hour west of the Greater Toronto Area. The first phase of the development will include a total of 869,205 SF over four buildings in a modern, campus environment. The site directly connects to Trans-Canada Highway 401 immediately to the west and the Queen Elizabeth Way (QEW) to the east by Highway 403. The location offers direct access to a population of 3,043,000 within a one hour drive time radius, 11,377,000 within two hours and 30,514,000 within five hours on both sides of the border.

artist rendering of propsed buildings at Granite Telephone City Logistics Centre

Leading green design features

Granite Telephone City Logistics Centre will feature a Two Green Globes rating, demonstrating a significant achievement in resource efficiency, reducing environmental impacts, and improving (future) occupant wellness. Green Globes for New Construction evaluates the environmental sustainability, health and wellness of future tenants, and resilience of new construction and major renovation projects through the latest science, research, and alignments with technical advancements. Environmental objectives pursued through Green Globes lead to lower energy and water bills, reduced emissions, optimized health and wellness benefits, and minimized waste.

Buildings in development

CharacteristicBuilding 1*Building 2*Building 3*Building 4*
Available Size 410,750 SF 205,720 SF
divisible to 102,860
158,854 SF
divisible to 72,585
93,881 SF
Office Up to 3% of leased area, built to suit Up to 3% of leased area, built to suit Up to 3% of leased area, built to suit Up to 3% of leased area, built to suit
Ceiling Height 40’ Clear 40’ Clear 40’ Clear 40’ Clear

Bay Size

50’ x 50’ 51’ 11.75” x 49’ 2.5” 49’ 2.5” x 52’ 6” 53’ 1.75” x 52’ 8”
Loading 65 Docks
2 Drive Ins
36 Docks
2 Drive Ins
19 Docks
2 Drive Ins
10 Docks
1 Drive In
Trailer Storage 139 Positions - 13 Positions 7 Positions
Car Parking 333 Stalls 175 Stalls 158 Stalls 103 Stalls
Occupancy Q4-2023 Q3-2023 Q3-2023 Q3-2023

* Site plan approval underway (subject to municipal approval)

basic site plan drawing

Contact

Mitchell Blaine

Adam Sherriff-Scott

Luke Slabczynski

Kathy Kolodziej